Loris Real Estate For Sale
Loris, SC 29569
- MSF 20Zoning
- AcreageType
- 1# Lots
- WellWater
- HorryCounty
- 3.15Acres
- MLS# 2505224
- Land
- Acreage
- Active
- Approx Time on Market1 year, 4 months, 8 days
- AreaLoris To Longs Area--South of 9 Between Loris & Longs
- CountyHorry
- Subdivision Not within a Subdivision
Overview
Build your future dream home on this 3.15-acre parcel which is zoned residential. There is an existing 4000 Square Foot Commercial grade building on the property which provides the opportunity to have a home and business at the same location. Steel frame construction on heavy duty concrete slab built in 2002, ideal for use as a warehouse, workshop or storage. The building has a height of 14’ and a dock door (12’ x12’) that big enough to provide interior access for large trucks and construction vehicles. There are two points of access for this property. #1 is the existing path across the grass from Dusty Road, a county maintained paved road, where the “3012” address marker is located. #2 also a 50’ access easement along the neighboring property that also connects with Dusty Road. Deed Restrictions: cannot subdivide, only two single family homes can be built on the property. Manufactured homes are OK, single wide homes not allowed. Horry County MSF 20 Zoning. The property has been cleared with a tree buffer for privacy. There is a pond at the far end of the property. There are areas on the property that will support septic. There is an available water hook-up at Dusty Road. Ultra-high speed fiber optic internet and VoIP for phones is available from Dusty Road. Close to Daisy Elementary School & Red Bluff Road. Just a short drive to Loris, Conway, Highway 22, Highway 9 & Highway 701.
Agriculture / Farm
Association Fees / Info
Hoa Frequency: Monthly
Bathroom Info
Building Info
Zoning: MSF 20
Buyer Compensation
Exterior Features
Financial
Number of Lots: 1
Garage / Parking
Interior Features
Lot Info
Acres: 3.15
Lot Size: 760x255x583x164 + front
Lot Description: IrregularLot, OutsideCityLimits, Acreage
Misc
Offer Compensation
Other School Info
Property Info
County: Horry
Road Frontage Type: CountyRoad
Road Surface Type: Asphalt
Stipulation of Sale: None
Property Sub Type Additional: Acreage
Room Info
Sold Info
Tax Info
Utilities / Hvac
Sewer: SepticPermit
Utilities Available: CableAvailable, ElectricityAvailable, PhoneAvailable
Water Source: Well
Waterfront / Water
Directions
The property is located close to Daisy Elementary School, Daisy Road, Hwy 66, Cherry Hill Road & Red Bluff Road. Access for the property is on an existing path across the grass from Dusty Road, a county maintained paved road, where the 3012 address marker is located. 3012 Dusty Road, Loris, SC 29569. GPS 33.990383, -78.883069Courtesy of Re/max Southern Shores Gc - Cell: 843-450-8760
MLS# 2616966
Provided courtesy of © Copyright 2026 Coastal Carolinas Multiple Listing Service, Inc.®. Information Deemed Reliable but Not Guaranteed. © Copyright 2026 Coastal Carolinas Multiple Listing Service, Inc.® MLS. All rights reserved. Information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing.
Images related to data from the MLS is the sole property of the MLS and not the responsibility of the owner of this website. MLS IDX data last updated on 07-12-2026 10:01 AM EST.
Any images related to data from the MLS is the sole property of the MLS and not the responsibility of the owner of this website.